Observation Note of the inspection carried out by the undersigned on the date 11.08.2025 of the 6-lane bridge being constructed on the river Ganga from Malaka Tirahe to Beli Kalash Chauraha
| Title | Date | View / Download |
|---|---|---|
| Observation Note of the inspection carried out by the undersigned on the date 11.08.2025 of the 6-lane bridge being constructed on the river Ganga from Malaka Tirahe to Beli Kalash Chauraha | 11/08/2025 | View (1 MB) |