Close

Observation Note of the inspection carried out by the undersigned on the date 11.08.2025 of the 6-lane bridge being constructed on the river Ganga from Malaka Tirahe to Beli Kalash Chauraha

Observation Note of the inspection carried out by the undersigned on the date 11.08.2025 of the 6-lane bridge being constructed on the river Ganga from Malaka Tirahe to Beli Kalash Chauraha
Title Date View / Download
Observation Note of the inspection carried out by the undersigned on the date 11.08.2025 of the 6-lane bridge being constructed on the river Ganga from Malaka Tirahe to Beli Kalash Chauraha 11/08/2025 View (1 MB)