Inspection report of the inspection of the construction site of new 6-lane bridge parallel to the bridge over river Ganga at Phaphamau on National Highway-96 in Prayagraj district, carried out by the undersigned on 07.11.2025
| Title | Date | View / Download |
|---|---|---|
| Inspection report of the inspection of the construction site of new 6-lane bridge parallel to the bridge over river Ganga at Phaphamau on National Highway-96 in Prayagraj district, carried out by the undersigned on 07.11.2025 | 07/11/2025 |
View (1 MB)
Alternate File :
View (1 MB)
|